Please use this identifier to cite or link to this item:
https://sci.ldubgd.edu.ua/jspui/handle/123456789/7609
Title: | Simulation of watershed process on Ukraine-Polish border areas |
Authors: | Стародуб, Юрій Петрович Гаврись, Андрій Петрович Будчик, Павло |
Keywords: | modelling civil protection |
Issue Date: | 2016 |
Citation: | 1. ISO 19101: 2009. Ukraine National Standard "ISO 19101: 2009 Geographic Information. Reference Model (in Ukrainian). 2. ISO 4758:2007 Remote Sensing of the Earth from Space. Data processing. Terms and Definitions (in Ukrainian). 3. Podrezov Y. Methodological Basis of Forecasting Forest Fire Emergency Situations [Text]/ Y. Podrezov, M.A. Shahramanyan. - Moscow: Institute of Civil Defense, 2001. - 266 p. (in Russian). 4. Стародуб Ю.П., Урсуляк П.П. Інформаційні технології в комп’ютерному моделюванні еколого-геофізичних процесів. ЛДУ БЖД. Львів, 2013. – 159 с. 5. Site of CGIAR- CSI. [Electronic resource]: Access: \www/URL: http://srtm.csi.cgiar.org 19.05.2014 p. Name of the screen. 6. Project Site Earth Explorer: [Electronic resource]: Access: \www/URL: http://earthexplorer.usgs.gov 19.05.2014 p. Name of the screen. 7. Burshtynska Kh.V. Aerospace Shooting System [Text]: Teach. guide/H. W. Burshtynska, S. Stankevich. - Lviv: Publishing House of Lviv Polytechnic University, 2010 - 292 p. (in Ukrainian). 8. Asimov O.T. Technologies of Remote Sensing and GIS in the Creation of Information Systems Risk Analysis of Emergency Situations of Techno genic and Natural Character [Text]: Proceedings of the conference. "GIS Forum - 2000", 13-16 November 2000 m. Kyiv - Kyiv: GIS Asots. Ukraine, 2000. - P. 66 - 72. (in Ukrainian). |
Abstract: | Process modeling on Polish-Ukrainian border area watersheds - a set of interrelated activities and operations carried out for the creation of watershed modeling simulation and ranks runoff of Poland and Ukraine under flooding territory were given [1,2]. Each process is characterized by its inputs (raw data), modeling tools and techniques, and the resulting outputs can be applied. Project Manager must consider all possible measures and processes of the organization and environmental factors. They should be considered for each stage of the watersheds processes modeling. Even if they are not explicitly mentioned in the list of inputs in the specification process, especially important in this are the measures to ensure cooperation between rescue teams from both countries. Measures, means and steps of the performers give guidance and criteria for how to adapt the stages of process modeling watersheds to specific project needs. Management processes on the Polish-Ukrainian border areas in the project hazard study are emergencies presented as discrete processes with defined boundaries |
URI: | http://sci.ldubgd.edu.ua:8080/jspui/handle/123456789/7609 |
Appears in Collections: | 2016 |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Konferencja_sejm_2016 - 1 стаття.pdf | 243.28 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.